Weston FL's New Walking Trail and Bike Lanes: What's Planned

Between Saddle Club Road and State Road 84, the City of Weston's plans call for a six-foot-wide trail of coquina and mortar running about 1.75 miles, with heavy-duty edging along its sides and ten Robinia exercise stations along its length. The City calls it the Weston North Walking Nature Trail. It has no parking lot. The City's project page says it plainly: "There is no designated parking; access is by walking or biking."

In a city where Weston Regional Park, Vista Park and Indian Trace Park have always been places you drive to, that missing lot is the clearest sign of a change in direction. Between now and 2028, the projects on Weston's schedule are mostly about two things. One is getting between places without a car. The other is staying active when it is hot or raining. The trail is the first piece, and the rest arrive in a sequence residents can plan around.

A trail built for neighbors

The City says outright that the trail "is designed for local users." It calls the trail the first step toward a greenway system meant to "better connect neighborhoods and parks" and to reduce "the need to use a car to reach a park, exercise path or neighborhood destination." Leashed dogs are welcome, and no motor vehicles of any kind are allowed. For people who don't live within walking distance, the City suggests parking at Indian Trace Park or at nearby plazas where that is permitted. From there it's "a short warm-up walk" to the trailhead.

The project cost an estimated $655,785, and a Florida Department of Environmental Protection grant covered $450,000 of it. Westwind Contracting started work in November 2025. The completion target was originally May 2026 and now reads "early Fall 2026." As of October 11, the City has not announced an opening. The latest photo update on the project page is from July 2026, and no ribbon cutting appears on the October events calendar. Treat it as due this fall, and check the project page before lacing up.

Shade went in before the path

The trail doesn't end at State Road 84. In late 2025, the City planted 66 trees along the SR 84 sidewalk between Glades Parkway and Indian Trace. Crews started on November 20 and finished November 26. The City's January 2026 announcement says the planting was designed to shade a walking route that connects with the new trail.

The trees went into the ground in the same month trail construction started, so their canopy gets a head start on the rest of the network. Together, the trail and the shaded sidewalk make a continuous walking route through north Weston, and neither one does that alone.

The bike lanes come in a specific order

Next comes Bonaventure Boulevard. The City plans to widen, mill, resurface and restripe the road from Indian Trace north to SR 84, about 9,200 linear feet. It will add a five-foot bike lane on each side, narrowing to four-foot "keyholes" in spots where the right of way or utility poles leave no room for the full width. The road was already due for resurfacing, and the City is using that work to add a link to its bike network. A Federal Highway Administration grant pays for it, at an estimated $478,081.

The City Commission awarded the construction bid at its August 17, 2026 meeting. According to the project page, design wrapped up in September 2026 and construction is expected to start in December 2026. The page also lists January 2027 as the date the work is "To Be Completed." Both dates are City estimates. For anyone who drives Bonaventure every day, they suggest resurfacing work will overlap with the holidays.

Saddle Club Road is further behind. The planned bike lanes would run from just west of Lakeview Drive to Weston Road, and the City lists the project's main benefit as connecting to other bike lane segments, "including connection to Markham park." Kimley-Horn and Associates is handling a nine-month design phase budgeted at $414,000. No construction date is posted yet. When work does start, the City says it will be phased, lane closures will be limited to non-peak hours, and the road will never fully close.

Once all three are built, a cyclist could ride the shaded SR 84 corridor and the North Trail, take Bonaventure's new lanes, and follow Saddle Club west toward Markham Park. The 2024 Parks Master Plan schedules more trail expansion in its short-term window of years one to three and its mid-term window of years four to six.

Moving play out of the weather

The second half of the plan is about the weather. On September 28, 2026, the Commission agenda included a contract award for relocating the maintenance yard at Weston Regional Park and building seven new covered pickleball courts. The courts will sit under a prefabricated steel structure 240 feet by 80 feet, about 19,200 square feet of covered play. The City says the roof is there so play can continue "out of the strong sun and rain."

These courts won't be quick. The project has two phases. First comes a new 4,507-square-foot maintenance building on a vacant part of the park. Only after that building is substantially complete and occupied will the old maintenance yard be torn down to make room for the courts. The project page hasn't been updated since the award and still lists its schedule as TBD. Until the courts open, Indian Trace Park and Regional Park's existing courts remain the public pickleball options, as Weston Together's 2026 parks guide notes.

The biggest project on this list is the Vista Park recreation center, which also tackles the weather problem. Vista Park opened in June 2005 as a 30-acre athletic park next to Cypress Bay High School. The new phase will develop its last five acres. Plans call for a 45,000-square-foot recreation center with an indoor walking and running track, a gymnasium, indoor courts and multipurpose rooms. Outside there will be covered courts, a shaded playground and a splash pad. The City's parks master plan identified a "critical shortage" of indoor recreation space. The estimated cost is $33,792,599. Construction starts in November 2026, and completion is expected in May 2028.

Seen together, the projects follow one logic. The trail and the SR 84 trees are for walking outdoors. The covered courts and the indoor track are for the hours when outdoors doesn't work.

When each piece arrives

  1. Early fall 2026: North Walking Nature Trail completion target, with no opening announced as of October 11.
  2. November 2026: Vista Park recreation center construction begins.
  3. December 2026: Bonaventure Boulevard bike lane construction expected to begin.
  4. January 2027: Bonaventure bike lanes listed as "To Be Completed."
  5. Date TBD: Regional Park covered pickleball courts, which follow the new maintenance building.
  6. Date TBD: Saddle Club Road bike lanes, still in design.
  7. May 2028: Vista Park recreation center expected completion.

One more park note for families: as of July 2026, Weston Together reported that Windmill Ranch Park was closed for construction improvements.

The fall calendar, in the meantime

The construction will take a while, but Weston's free programming at its existing parks keeps going this fall. All dates below are from the City's live calendar.

  • October 16, 5:30 to 7:30 p.m.: Chillin' with BSO at Weston Regional Park, Baseball Field #8, with family sports, ice cream and local first responders.
  • October 17, 11 a.m. to 1 p.m.: Chalk in the Park, themed "Postcards from Weston," at Library Park, 4255 Bonaventure Blvd. Admission is free.
  • November 7: The Kid-tacular Show Series presents "Marci Poppins The Explorer" at 1:30 and 3 p.m. at the Weston Community Center, 20200 Saddle Club Road. That evening, the Moonlight Movie in the Park shows Toy Story 5 from 7:30 to 9:15 p.m. at Regional Park's event stage.
  • November 14, 7 to 9:30 p.m.: The WestonNights Outdoor Concert features FLAVOR at the Regional Park event stage, with food trucks on site.
  • December 6, 6 a.m. to noon: The 29th Annual Rotary Run for Tomorrow, the Commission Cup 1-Mile Health Walk and the Health & Fitness Festival.
  • December 12, 5 to 6:15 p.m.: Symphony in the Park plays Holiday Favorites at the Regional Park event stage, with free admission.

Weston Together's "Weston at 30" series recalls that roughly 90% of voters chose to make Weston its own city. Thirty years later, a trail that the City says is reached only on foot or by bike is due this fall.

If you'd like to know how the North Trail, the Bonaventure corridor or the future Vista Park center will change daily life on a particular Weston street, Tayse Dantas follows these projects closely and is happy to talk through the details with you. More local context is on the Weston neighborhood page. Let's Connect.

Ready When You Are

With a consultative and deeply human approach, she doesn't just sell properties; she guides families in building the right future in the right place. She delivers strategy, security, and long-term vision. She works in both the residential and commercial segments, always with 100% personalized service.